Product Detail :
|
Carrying out FLS for construction of Bye-pass line at Dhone (12.78 km ) like fixing of alignment, pegging out center line, taking levels and finalization of land acquisition proposals, soil investigations, geological investigations for bridges by drilling bore holes, collecting samples, calculation of water way requirement for all the proposed bridges and preparations of GAD's of bridges, station yards, project sheets and submission of detailed estimate complete in all respects with different survey works requiring to be carried out using LiDAR Technology, making EPC documents based on the FLS survey conducted for calling EPC tender and (ii) Preparation of land acquisition proposals for doubling between Perrur - Dhone stations (141.12 Km) of MBNR - DHNE section in Wanaparthy district, JogulambaGadwal Dist., Kurnool Dist., and Nandyal Dist.
|
Tender Detail : |
(i) Carrying Out Fls for Construction of Bye-pass Line at Dh...... |