Product Detail :
|
Feasibility Study and Preparation of GADs, Detailed Project Report, Preparation of Detailed Drawings and Design for Foundation, Sub- structure & Super- Structure of Road Over Bridge including Viaduct Spans and Approaches; Design of Retaining Wall; Proof Checking of Foundation, Structural and RE Wall/Retaining Wall Design; Preparation of BOQ; Preparation of Detailed Estimate; Conducting Final Location Survey; Preparation of Land Acquisition Proposals; Conducting Geotechnical Investigation and Preparation of Bid Document with Technical Specifications as per relevant Codes/Manuals for Construction Of 24 ROBs in connection with Elimination of Level Crossings in stations between Kondagunta - Renigunta stations of GDR-TPTY section of South Jurisdiction.(list of level crossings enclosed)
|
Tender Detail : |
Guntakal Division - Feasibility Study and Preparation of Gad...... |