Product Detail :
|
1. Signallilng portion of work in connection with TTR(FS+TWS+WCMSC)-17 sets,
TTR(WCMSC)-36, TTR(FS)-130, TTR (CS+CMS)-80, TTR(CS)-21, TTR(CMSC)-12 GJ-
554 TWSEJ-660.2. Signallilng portion of work in connection with CTR-P-2.734 Km,
TRR-P-15.253 TTR(FS+TWS+CMSC)-39 sets, TTR(DS)-02sets, Glued Joints-350 Nos
and Side Drain- 1625 meters bet Korukonda - Duvvada - Loop Lines.3. Signallilng
portion of work in connection with TRR(P) - 25.948, TTR (FS+TWS+CMSC)-11 sets
bet Palasa - Vizianagaram - Donkinivalasa - Loop Lines.4. Signalling portion of work
in connection with Palasa-Vizianagaram-Donkinavalasa-TSR(P)-26.181 Tkm.5.
Signallilng portion of work in connection with TRR(P)-22.244 TKm between
Korukonda - Duvvada Sections.6. Signallilng portion of work in connection with
Palasa - Korukonda - Donkinavalasa & NWP-GNPR - Renewal of 60Kg CMS Xings -
50 Sets.7. Signallilng portion of work in connection with TTR(CMSC Xings)-50 sets
between Korukonda -Duvvada section.8. Signalling portion of work in connection
with Palasa-Ponduru - Renewl of 60Kg CMS Xings-45 Nos.9. Signalling portion of
work in connection with Palasa-Korukonda (VZM & KUK Yards) - TTR (CS+CMSC)-3
sets.10. Signalling portion of work in connection with TRR(P) - 1.691 km from Km.
831.000 to 834.960 DN line in patches between Korukonda - Alamanda in Main
Line.
|
| Tender Detail : |
1. Signallilng portion of work in connection with TTR(FS+TWS+WCMSC)-17 sets,
TTR(WCMSC)-36, TTR(FS)-130, TTR (CS+CMS)-80, TTR(CS)-21, TTR(CMSC)-12 GJ-
554 TWSEJ-660.2. Signallilng portion of work in connection with CTR-P-2.734 Km,
TRR-P-15.253 TTR(FS+TWS+CMSC)-39 sets, TTR(DS)-02sets, Glued Joints-350 Nos
and Side Drain- 1625 meters bet Korukonda - Duvvada - Loop Lines.3. Signallilng
portion of work in connection with TRR(P) - 25.948, TTR (FS+TWS+CMSC)-11 sets
bet Palasa - Vizianagaram - Donkinivalasa - Loop Lines.4. Signalling portion of work
in connection with Palasa-Vizianagaram-Donkinavalasa-TSR(P)-26.181 Tkm.5.
Signallilng portion of work in connection with TRR(P)-22.244 TKm between
Korukonda - Duvvada Sections.6. Signallilng portion of work in connection with
Palasa - Korukonda - Donkinavalasa & NWP-GNPR - Renewal of 60Kg CMS Xings -
50 Sets.7. Signallilng portion of work in connection with TTR(CMSC Xings)-50 sets
between Korukonda -Duvvada section.8. Signalling portion of work in connection
with Palasa-Ponduru - Renewl of 60Kg CMS Xings-45 Nos.9. Signalling portion of
work in connection with Palasa-Korukonda (VZM & KUK Yards) - TTR (CS+CMSC)-3
sets.10. Signalling portion of work in connection with TRR(P) - 1.691 km from Km.
831.000 to 834.960 DN line in patches between Korukonda - Alamanda in Main
Line. |